Ysgol Bro Alun for Read Construction

02/12/2020 –

  • Eurazinc roof from Bemo fixed to Kingspan Karrier panel.

  • A number of powder coat aluminium materials surrounding the windows and doors manufactured by ourselves.

  • Powder coat aluminium rainwater goods manufactured by ourselves

  • K20 tiles on an Omega rail system.

  • Sika single ply membrane installed onto Kingspan Karrier panel including a curved area of roof.

  • Bespoke powder coat Cappings supplied by ourselves and powder coat bullnose to align into existing building.

  • A number of penetrations such as sun pipes and skylights cut out and weathered by Lester Cladding.

13/11/2020 – All new cladding installed on to the building is to match the existing building.