Charging The Way Forward

Our new electric charging points represent a significant step towards reducing our carbon footprint and embracing sustainable practices.

Our new electric charging infrastructure consists of three charging points, designed to cater to various needs and charging speeds- 1 x 22kw Dual (AC Voltage) – Floor Standing and 2 x 20kw Single (DC Voltage) Rapid Charge – Floor Standing.

With three charging points offering varying speeds, we are committed to providing convenient and efficient charging options for our growing fleet of electric machines. The benefits of adopting electric machines in the construction sector are great. By utilising electric-powered equipment, we actively contribute to curbing greenhouse gas emissions, thus playing a crucial role in combatting climate change.

Additionally, electric machines operate more quietly, reducing noise pollution and enhancing the overall working environment for our employees and surrounding communities.

Additionally, these machines offer increased efficiency, translating to cost savings in the long run and promoting energy conservation.

As a company dedicated to sustainable growth, we are excited to lead by example and inspire positive change within the construction industry and beyond.

By incorporating a wide range of electric machines, including Bi Fuel, scissor lifts, and cherry pickers, we demonstrate our commitment to diversifying our fleet and embracing the latest technological advancements.

As we continue to invest in sustainable practices and renewable energy sources, we hope to set a precedent for other companies in the industry to follow suit.

At Lester Cladding, we are proud to be at the forefront of the green construction movement, actively contributing to a cleaner, greener future for all.